PROJECT:
Complete new installation of 2 railway point heating systems, triple.s complete system, at new single-turnout points,1:300, in the Farchant railway station.
ENERGY/HEAT SOURCE:
Ground water, tapped via an extraction and absorbing well with 5 coaxial probes.
SERVICES:
Planning services, project management, construction management, authorisation procedures and approval procedures. Construction preparation costs for tapping of the heat source and heat source design. Complete setting up of building site and earthworks. Manufacture of heat exchangers and point lock heaters. Constructional track superstructure activities.
SPECIAL REQUIREMENTS:
First use of coaxial probe technology in a point heating system in the day-to-day operations of DB AG. The winter of 2012/2013 was marked by absolutely trouble-free operation and full availability of the points.
Contact
TRIPLES-SYSTEME GMBH
Brunshofstrasse 6-8
D-45470 Mülheim an der Ruhr
T. +49 (0) 208/911 020 – 10
F. +49 (0) 208/911 020 – 29