PROJECT:

Complete new installation of 7 point heating systems at existing points in the Vilseck railway station.

 

ENERGY/HEAT SOURCE:

Ground earth, tapped via depth probes and energy cages.

 

SERVICES:

Planning services, project management, construction management, authorisation procedures and approval procedures. Construction preparation costs for tapping of the heat source and heat source design. Complete setting up of building site and earthworks. Manufacture of heat exchangers and point lock heaters. Constructional track superstructure activities.

 

SPECIAL REQUIREMENTS:

In spite of an expert opinion presented by the ordering party, no ground water was found during construction preparation.  As an alternative heat source, triple.s planned and tapped the ground earth with depth probes and energy cages. The facility was erected for a trial operation of 2 years.  At the request of the ordering party the local area heating pipeline was laid in a cable duct with 5 track underpasses.

Contact

TRIPLES-SYSTEME GMBH

Brunshofstrasse 6-8
D-45470 Mülheim an der Ruhr

T. +49 (0) 208/911 020 – 10
F. +49 (0) 208/911 020 – 29

I hereby consent to the collection, processing and use of my personal data. You can find more information in our data protection declaration.

1 + 7 =