+49 (0)208-911 020 10 info@triples-systeme.com
MÁV ZRT., INFRASTRUCTURE BUSINESS UNIT, BUDAPEST | SZOMBATHELY RAILWAY STATION | 2008

PROJECT:

Design and implementation planning of 7 point heating systems with the triple.s system in combination with a railway platform surface heating system for 2,500 square metres.

 

ENERGY/HEAT SOURCE:

Ground earth, tapped via depth probes.

 

SERVICES:

Preliminary hydrological and geological assessment of the regional situation. Quantity survey of the complete measure with implementation planning. Design of a suitable heat exchanger.

 

BESONDERE ANFORDERUNGEN:

For the rail profile in Hungary a special heat exchanger was developed by triple.s.  The integration of a railway platform surface heating system was also included in the hydraulic planning and the necessary adjustments made.

Contact

TRIPLES-SYSTEME GMBH

Brunshofstrasse 6-8
D-45470 Mülheim an der Ruhr

T. +49 (0) 208/911 020 – 10
F. +49 (0) 208/911 020 – 29

I hereby consent to the collection, processing and use of my personal data. You can find more information in our data protection declaration.

6 + 6 =