DB Netz AG via ARGE point heating | Holzminden railway station | 2010

project_tripleS1W 18 Hol_x

// PROJECT:

Supervision of 2 railway point heating systems (complete pilot system) at two single turnout points, 1:500 and 1:300, in the Holzminden railway station through to product approval by DB AG.

 

// ENERGY/HEAT SOURCE:

Depth probes developed as a duplex version.

 

// SERVICES:

Project management, construction management, authorisation procedures and approval procedures. Constructional track superstructure activities and installation of new control software for connecting the system to the control station in Göttingen.

 

// SPECIAL REQUIREMENTS:

A non-mature technology was further developed as a functional point heating system with the help of the triple.s systems. Acceptance by the admissions office of DB AG in summer 2012.

««« zurück